
Tower Bridge Wharf
RESIDENTS APPLY FOR PLANNING PERMISSION TO CLOSE GATES EARLIER. The residents of Tower Bridge Wharf have filed a planning application with Tower Hamlets Council to close the gates to the Thames Path at 7pm on
RESIDENTS APPLY FOR PLANNING PERMISSION TO CLOSE GATES EARLIER. The residents of Tower Bridge Wharf have filed a planning application with Tower Hamlets Council to close the gates to the Thames Path at 7pm on
This 4-minute film explains how we plan to create a continuous walkway along the Thames Path in Tower Hamlets.
It is hoped the long-awaited work to the Bridge at Cascades will finally take place later this year, cutting journey times for users of the path. Local residents and visitors have been forced for over
Yesterday was wet and windy, but absolutely beautiful for a cycle ride around the Isle of Dogs with Will Norman. Will is the Walking & Cycling Commissioner at City Hall. He has been responsible for
https://youtu.be/wJ1kXiv5Gy8 Tideway have closed the Thames Path at King Edwards Memorial Park in Wapping. This is to build their control kiosk which contains the equipment that monitors and controls the sewer. The schedule was from
The Canal & River Trust closed the bridge at the end of the path next to the Cascades building, following an engineering report that declared the bridge unsafe. This has closed off a whole section of path.
Free Trade Wharf have applied for a demolition order for Charrington Jetty on the Thames Path just to the east of King Edwards Park. Crumbling concrete, rotten timbers In February the PLA (Port of London
The Thames Path in Chiswick is to get a river walkway to allow the path to pass under the railway bridge at Duke’s Meadow. … As shown on the map, the railway bridge blocks off
Subscribe to our email newsletter for a monthly campaign update!
Copyrights 2022 © Reclaim Our River. All Rights Reserved.