
Will Norman joins the campaign
Yesterday was wet and windy, but absolutely beautiful for a cycle ride around the Isle of Dogs with Will Norman. Will is the Walking &
Reclaim Our River is an East London based campaign which aims to create a continuous, unobstructed Thames Path from Tower Bridge to the River Lea, and beyond.
Yesterday was wet and windy, but absolutely beautiful for a cycle ride around the Isle of Dogs with Will Norman. Will is the Walking &
https://youtu.be/wJ1kXiv5Gy8 Tideway have closed the Thames Path at King Edwards Memorial Park in Wapping. This is to build their control kiosk which contains the equipment
The Canal & River Trust closed the bridge at the end of the path next to the Cascades building, following an engineering report that declared the bridge unsafe. This has closed off a whole section of path.
Free Trade Wharf have applied for a demolition order for Charrington Jetty on the Thames Path just to the east of King Edwards Park. Crumbling
RESIDENTS APPLY FOR PLANNING PERMISSION TO CLOSE GATES EARLIER. The residents of Tower Bridge Wharf have filed a planning application with Tower Hamlets Council to
This 4-minute film explains how we plan to create a continuous walkway along the Thames Path in Tower Hamlets.
Subscribe to our email newsletter for a monthly campaign update!
Copyrights 2022 © Reclaim Our River. All Rights Reserved.